EREA Pharma News Center

Latest News

Jul 09 2024

INSTALLATION – L-UDAF

After a successful FAT at our workshop, our technicians went to install the Unidirectional Laminar Flow at the customer's plant! Indeed, our technicians always go on...
Jul 04 2024

METROLOGY AREA

EREA PHARMA innovates and thinks about the environment! EREA had a Containment Station on its premises. No longer in use and destined for destruction, it has found a...
Jun 25 2024

STAFF TRAINING

Staff training is a master objective in our Quality policy, and the control of the industrial risks that surround us is very crucial. That's the reason why EREA PHARMA...
Jun 20 2024

INSTALLATION – TOXIC ISOLATOR

The isolator for toxic applications, which was FATed  a few weeks ago, has now been installed at our customer workshops! This isolator is an ATEX-certified equipment...
Jun 18 2024

ASSEMBLY AT WORKSHOP – WEIGHING STATION

A great project for one of our most best customers. For several years now, EREA has been answering to our customer specific requests. New project going on:  a small...
Jun 15 2024

ACHEMA 2024 – EREA EXHIBITION

End of the ACHEMA 2027 show adventure for EREA! It was a real pleasure to meet industry leaders, to discover inspiring innovations, and to share our own advancements at...
Jun 11 2024

Exhibition- ACHEMA 2027

EREA is at Frankfurt in Germany, until the 14th June, to welcome you in its madeinfrance booth! Meet us in hall 3.1, booth B37. Come and discover our standard equipment...
Jun 06 2024

FORUM – A3P Belgium 2024

EREA is today, at the A3P Belgium Forum, in Kain (Tournai). The main subject of this forum is the Filling and the Finishing aspects in production! The meetings will...
May 21 2024

 FAT – ISOLATOR  FOR TOXIC APPLICATION

Last week we did the FAT of one of our isolators for toxic application. This isolator is designed for weighing antibiotics. As a result, EREA made a 2-gloves isolator...
May 19 2024

MOCK-UP RECEPTION

Arrival of a new mock-up in our workshops! The mock-up process is a very important step in the design of our custom-made equipment since it enables us to validate the...

All News

New year

New year

The Erea team wish you all a very happy New year 2024! May this newyear be filled with exciting new challenges, stimulating opportunities, times of shared joy, and above all the best health to all. We look forward to keep growing, learning and succeeding together....

Visit from our Customer

Visit from our Customer

Last week, EREA PHARMA had the visit of a very good customer for the final validation of a mock-up for a filling machine. That validation came after a request from our customer for some modifications asked for during their last visit. The strength of EREA PHARMA is to...

Bio Safety Cabinet

Bio Safety Cabinet

These last weeks, we've been working on small projects in our workshops at Erea! A horizontal laminar flow cabinet has been completed. It is designed to protect both the working area and the product. This equipment will be installed in a class C cleanroom. The goal of...

Project in Progress – HVAC

Project in Progress – HVAC

At the request of one of our customers, EREA PHARMA is revamping the air handling unit and decontamination system of an isolator used for the aseptic production of suspensions. For information, that isolator was not produced by EREA PHARMA. This equipment is made of...

Focus – Welding Certification

Focus – Welding Certification

Our welders are talented! At EREA, among our team, they are exceptional welders! At EREA, quality is a priority to meet the needs of our customers. Currently, Bureau Veritas coaches our welders in their Certifications.At the end of the exams and after an X-ray check,...

EREA Commitments

EREA Commitments

Since the year 2022, EREA PHARMA has been preparing the day of tomorrow!  Rémy Rembert, our QHSE Engineer, is daily involved in this process!! 3,5 : What does that figure refers to?  That's what EREA PHARMA gained, in one year time, by dividing its lighting use thanks...

Bio Safety Cabinets – Final Destination Reached

Bio Safety Cabinets – Final Destination Reached

During  the last 2 weeks, an EREA PHARMA  team was in the south of France installing and assembling 2 bio safety cabinets. The customer is satisfied with the two Type 1 Safety cabinets; all custom-made so as to meet the customer's requests and specifications. At the...

Filling Tests

Filling Tests

At EREA PHARMA, we care about the processes used to make our equipment! That's why EREA PHARMA teams work regularly on filling tests for aseptic distribution lines under isolators, which require the installation of a peristaltic pump. Camille Bonnard & Sébastien...

Isolator Mock-up

Isolator Mock-up

After the validation, in September, of the mock of the 1st part an isolator, we lately received the 2nd part of it at EREA PHARMA's workshops! Several components and pieces making up the mock-up had been assembled so that different people, who are to use this...

Minor Project – Protection Module

Minor Project – Protection Module

The equipment has been installed a few weeks ago at one of our customers plant. EREA PHARMA, which is specialized in custom made equipment, always answers the customers’ requests on their different needs and specificities. This equipment is a mobile protection module...

A3P Review

A3P Review

Last week was very rich in emotions! 4 days of good time, discoveries & talks. Once again, EREA PHARMA was delighted to take part in the A3P Association international congress in Biarritz, with the pleasure of attending and being part of the various conferences...

SAS Installation

SAS Installation

Very recently, two SAS (a single SAS and a double SAS) left our workshops to be installed ! Custom designed , these two SAS have been delivered at our customers’ plant in Île-de-France for assembly and installation by our technicians. They’ve been put between two...

Mock-up Validation by one of our Customers

Mock-up Validation by one of our Customers

Last week, we received one of our customers in our EREA PHARMA workshop! A validation from the customer is essential for the fabrication of a syringe filling line (PFS) into an isolator, since the equipment will be custom made according to their needs! We used...

Departure of 2 Bio-safety Cabinets

Departure of 2 Bio-safety Cabinets

For a few weeks, we have been working on a beautiful project at EREA PHARMA ! The fabrication and assembly of 2 bio safety cabinets (PSM type 1) were completed last week. Our customer had a specific request with the implementation of a formulation tank directly...

A3P Congress

A3P Congress

EREA PHARMA General Manager Alain DESERT and the Sales Department (Christophe Mortreux, Sébastien Goebel, Maxime Gontier) will be at the A3P international congress, in Biarritz from 10 to 12 October 2023 ! Come and chat with us at our R29 room. The Erea team will be...

EREA is a globally recognized leader in providing state-of-the-art isolator and cleanroom air flow solutions tailored to the specific needs of pharmaceutical, biotech, as well as cosmetic industries, all compliant with Annex 1 of GMP.

In order to manage the flow of information to our website, please enter your details. It will take you 1.30 minute of your time.